1. Initial response to all customer requests within 30 minutes.
2. On-site technical support with engineer arrival within 24 hours.
3. 24/7 emergency standby coverage with no gaps.
4. Routine faults diagnosed and resolved within the same day.
The service network covers the entire Xinjiang region, including seven service stations adjacent to Kazakhstan, Russia, and Mongolia, radiating to Central Asia. There are also subsidiaries in Shenzhen, Hainan, and the Northern Region throughout the country. Relying on platforms such as the Xinjiang Unconventional Water Resources Development Industry Innovation Research Institute, we conducted in-depth research on the pain points of frontline enterprises and quickly formed a special team to tackle them; Establish a rapid diagnosis database for industry wastewater issues, rely on proprietary patented technology to accurately locate faults on site, and provide one-stop closed-loop solutions; Localized product library for core service area layout, production of chemical agents, membrane components, etc. to achieve spot reserves without waiting for remote shipment; Full chain integrated technology coverage eliminates the cost of multi-party coordination and docking for customers, with dedicated personnel following up throughout the entire process.
We provide one-stop operation services such as dosing, operation, and cleaning of sewage, desalinated water, circulating water, and zero discharge systems for more than 400 influential domestic and foreign customers in different industries such as industrial parks, municipal, petrochemical, coal chemical, chlor alkali chemical, printing and dyeing, cotton pulp, electricity, water, steel, mining, food, paper, polysilicon, pharmaceuticals, textile printing and dyeing, and pharmaceuticals.
A silicon material enterprise in Inner Mongolia experienced a sudden blockage in its wastewater membrane system. Customer service responded within 30 minutes, and technical engineers arrived on site within 12 hours. The investigation was completed on the same day, and the first stage pressure difference of both systems was 0.42MPa. It was determined that the concentration of the chemical added was too high and the sterilization effect was poor. Then, online cleaning was carried out, and the first stage pressure difference was reduced to 0.2MPa. Considering the high strength of online cleaning, after communicating with the customer, offline cleaning was carried out. Currently, the system is operating normally


Copyright DeLan Water Technology Co., Ltd Address: No. 216 Lantian Road, North Industrial Park, High tech Zone, Urumqi City E-mail:delan@chinadelan.com
ICP Record number:新ICP备15000214号-1 Public Security Filing:新公网安备65010402000072号