• Technical Service
    Fault Handling, Operation and Maintenance Support, and Demand Response Mechanism

    1. Initial response to all customer requests within 30 minutes.

    2. On-site technical support with engineer arrival within 24 hours.

    3. 24/7 emergency standby coverage with no gaps.

    4. Routine faults diagnosed and resolved within the same day.

  • Design service
    Solution Planning, Drawing Issuance, Process Optimization, and Preliminary Coordination

    1. Preliminary design proposal delivered within 7–15 days for conventional industry projects.

    2. Iteration cycle for complex water quality solutions ≤ 10 days.

    3. Full-process design completed in-house, eliminating delays from outsourcing coordination.

    4. Design proposals are concurrently adapted for construction, ensuring zero rework.

  • Engineering Services
    EPC General Contracting、Construction & Installation、Commissioning & Acceptance、Operational Readiness Support

    1. Core membrane equipment manufactured in-house, reducing procurement lead time by 50%.

    2. Standardized construction procedures improve efficiency by 30% compared to industry benchmarks.

    3. Factory pre-commissioning enables on-site water quality compliance within 7–15 days.

    4. Early warning for key milestone delays ensures rapid corrective action and schedule recovery.

  • Small Process Section Operation
    Core Timeliness & Response Standards

    1. Daily Operation & Maintenance Issues: Response and initial handling within 2 hours.

    2. Process Parameter Abnormalities: Adjustment and rectification within 4 hours.

    3. Water Quality Fluctuations: Investigation and restoration to compliance within the same day.

    4. On-Site Resident Team: On standby duty, available on call at any time.

  • Customized Development / Research & Development
    Core Timeliness & Response Standards

    1. Standard Custom Requirements: Preliminary development plan to be issued within 15 days.

    2. Complex Custom Projects: Technical validation to be completed within 30 days.

    3. Core Custom Product R&D Cycle: Duration reduced by 40% compared to industry average, ensuring rapid response to customization demands.

  • Please stay tuned:德蓝股份
  • Supplier real-time quotation
  • Service:4006-010-078
  • TEL:0991-6767-678
  • Shenzhen:0755-8652-8969

Copyright  DeLan Water Technology Co., Ltd   Address: No. 216 Lantian Road, North Industrial Park, High tech Zone, Urumqi City   E-mail:delan@chinadelan.com

ICP Record number:新ICP备15000214号-1  Public Security Filing:新公网安备65010402000072号